ACE DuraFloŽ has successfully used its proven pipe relining system to save building owners and homeowners thousands of dollars, while also saving occupants the messy, noisy and destructive experience of a conventional repipe.
The dried pipes
are cleaned using an air and abrasive
mixture that prepares the inside surface
of the pipes for proper bonding of
the epoxy. An air and corundum mixture is used to sandblast the inside of the leaky pipes.
The final stage
of the ePIPE¨ process is the application
of the copper
pipe epoxy coating lining to the system.
This seals and protects the piping
system from future corrosion.