Mayflower Park
Seattle, WA

Village Green

The Problem:


The problem was related to pipe corrosion in the piping system in the Outpatient and Administrative Building’s chilled water and heating system. The heating system had an operating temperature of about 180° F.

Millennium Biltmore
Los Angeles, CA

 

 

Village Green

The Problem:


The problem they were experiencing was related to pipe corrosion in the piping system in the facilities chilled water and heating system. The two pipe heating- cooling system was made of Schedule 40 black steel main lines with soft copper branch lines. Pipe diameters ranged from a half-inch to 21⁄2 inches.

 